Update 03/11/12
Second base cast, pond ready for rendering after surface skimmers have been installed –


Rendering commences, first scratch coat –

Facing bricks to exposed wall –

Base for filters and equipment housing –

Eric Four unit, two of these will be used as sole filtration on the pond –

The final trowel finish has been applied to the render; once the pond base has been benched correctly then the pond will be covered and left to dry before the glass fibre is applied.
More soon.